Guide · Short answer

How to legalize a patio, room or addition built without a permit
in Hialeah and Miami-Dade

In many cases, yes: you pull a permit for the work that already exists (an after-the-fact permit). Miami-Dade County states that permits may still be issued and inspections carried out for existing work done without a permit, although parts of the work may need to be uncovered so the inspector can verify it.

In practice that means filing as-built plans, paying for the permit —with an additional charge because work started without one— and passing inspections through close-out. Each municipality has its own building department: in Hialeah you file with the city; in unincorporated areas, with the County.

Guide

Step by step

  1. Confirm who handles your caseMiami-Dade has 35 municipalities, each with its own building official; the County handles unincorporated areas (folios starting with “30”). In Hialeah, the City's Building Department.
  2. Gather what already existsProperty survey, photos of the work and, if there is one, a copy of the violation. The County also accepts proof of when it was built (aerial photos, tax records or surveys).
  3. Prepare as-built plansThe County requires a new application with as-built plans: at minimum a site plan and floor plan, plus the structural, electrical, mechanical, plumbing and roofing detail that applies.
  4. Professional certificationTo legalize with the County, an As-Built Certificate from a Florida-licensed engineer or architect is required, explaining how the work was verified.
  5. File and pay for the permitThe Florida Building Code allows an additional fee when work started before the permit; in Miami-Dade, if there is a Notice of Violation for work without a permit, the “double fee” (100% extra) applies.
  6. Inspections and close-outThe inspector may require parts of the work to be uncovered. Once inspections pass, the permit is closed and the work is legal.

What the official sources say

  • The Florida Building Code requires a permit to construct, enlarge, alter, repair or change the occupancy of a building (section 105.1). [1]
  • Anyone who starts work before obtaining the permit pays an additional fee set by the building official (section 109.4). [1]
  • Miami-Dade: “permits may still be issued, and inspections can still be carried out” for existing work done without a permit; it may need to be uncovered. [2]
  • Miami-Dade: with a Notice of Violation for work without a permit, the permit carries a 100% additional charge (“double fee”). [2]
  • Miami-Dade (Code Relief): as-built plans, an As-Built Certificate from a Florida-licensed engineer or architect, and proof of when the work was built. [3]

Would you rather we handle it?

WayMaker handles this case start to finish in Miami-Dade, Broward and Palm Beach.

See the service: Legalization (after-the-fact permits) →

Tell us your case — free
Frequently asked questions

Legalize unpermitted work

How much does it cost to legalize?
It depends on the municipality and the scope: the city charges the permit per its fee schedule, plus the additional charge for starting without a permit, and there may be other charges. We do not quote without seeing the property.
What if it cannot be legalized?
If the work does not meet the code or the setbacks, it may need to be modified or removed. That is why the first step is checking feasibility before paying for plans.
How long does it take?
Plans usually take 2 to 4 weeks, depending on the project. Then the city often takes up to ~30 days to review; timelines vary by municipality.