Commercial

Commercial renovations,
permits to open without delays.

We handle the permits for your commercial remodel or build-out —for example, a church converting a warehouse—: plans, permit and city follow-up, so you open fully in compliance. You build; we manage the permits.

Miami-Dade, Broward and Palm Beach · Office in HialeahLicense CRC 1333267

When do you need it?

  • You are remodeling or fitting out a commercial space (build-out).
  • You are converting a warehouse into a space for your business or church.
  • You need your permits in order to get your Certificate of Use.

What we do for you

  • Architectural, electrical, plumbing and HVAC plans
  • City permit
  • Inspection scheduling until you can operate

What we need from you

This is enough to start. Anything else we sort out with you on WhatsApp.

Business addressScope of the remodelLease or deed
How we work

From your case to the permit, step by step.

  1. Tell us about your caseThrough the form or WhatsApp. The evaluation is free and a real person on our team answers.
  2. We see the property and give you the estimateWhen the case calls for it, we schedule a site visit: we do not quote without seeing the property.
  3. We prepare everythingSurvey (if needed, done by an outside engineer), plans, engineering and documents.
  4. We submit to the cityYou pay the city fees directly on its portal; we answer the corrections.
  5. Permit, inspections and close-outWe coordinate the inspections through close-out, and you follow your case in real time.
Case file · WM-RENOV

What the rules say

  1. 01

    Residential owner-builder: the owner must reside at the property and bring a Florida driver's license with the same address.

    City of Hialeah · General Permit Requirements (PDF)
  2. 02

    Notice of Commencement when the job value is $2,500 or more, filed with the Miami-Dade County Recorder.

    City of Hialeah · General Permit Requirements (PDF)
  3. 03

    Building permit applications require an upfront fee with no refunds.

    City of Hialeah · General Permit Requirements (PDF)
Official sources, reviewed October 29, 2026Read the full guide →

Timelines

Plans usually take 2 to 4 weeks, depending on the project. Then the city often takes up to ~30 days to review —timelines vary by municipality.

Payments

Zelle, card, cash or wire transfer. Usually 70% to start and 30% when the plans or the service are completed.

Not included

Unless your estimate says otherwise, it does not include city fees, fines, construction or the survey.

Frequently asked questions

Commercial renovations

Does a commercial remodel need a permit?
Generally yes, especially with structural, electrical, plumbing or A/C changes. We tell you what applies to your space.
Do you also handle the Certificate of Use?
Yes. We can run the renovation and the Certificate of Use as one process.
What if the space changes use?
If the new business is a different use, we include the change of use in the process.